Through mid-June, 2019, approximately 1.35 million gallons of groundwater have been processed through the Permanent Groundwater Treatment System (Final Treatment System), which has been operational since April 2, 2019.
Previously, approximately 17 million gallons of groundwater were processed through the Temporary Groundwater Treatment System (TGTS) to maintain hydraulic capture of the plume. The TGTS operated from May 23, 2017 until the Final Treatment System was operational.
The site completed the second shipping campaign of 2015 on 31JUL with a total of 40 intermodal containers shipped containing 731,930 pounds (366 tons) of waste for disposal.
Loading activities on 29JUL15 in Building D for off-site shipping campaign.
Last updated on August 3, 2015