Through mid-June, 2019, approximately 1.35 million gallons of groundwater have been processed through the Permanent Groundwater Treatment System (Final Treatment System), which has been operational since April 2, 2019.
Previously, approximately 17 million gallons of groundwater were processed through the Temporary Groundwater Treatment System (TGTS) to maintain hydraulic capture of the plume. The TGTS operated from May 23, 2017 until the Final Treatment System was operational.
As of Monday, June 3, forty-eight containers have been shipped offsite, or approximately 446 tons.
Truck hauling waste containers leaving scale house.
Same truck as above leaving site entrance.