Through mid-June, 2019, approximately 1.35 million gallons of groundwater have been processed through the Permanent Groundwater Treatment System (Final Treatment System), which has been operational since April 2, 2019.
Previously, approximately 17 million gallons of groundwater were processed through the Temporary Groundwater Treatment System (TGTS) to maintain hydraulic capture of the plume. The TGTS operated from May 23, 2017 until the Final Treatment System was operational.
The most recent shipping campaign is ongoing. Shipment totals through the end of this week (15 May 2015) include 20 Intermodal Containers shipped and 426,040 lbs or 213 tons. Shipping will continue the next couple of weeks.
Last updated on May 25, 2015